Your Library Gets New Floors, Your Books Don't Move.
New Floors Go In, Shelves Stay Loaded
Built To Move Books and Shelves All at Once
Equipped for Loaded Library Shelving
Adrienne Floorcovering is one of the only commercial flooring contractors in Tampa Bay with specialized equipment to relocate loaded library shelving. That means a complete carpet replacement without removing the books, hiring a separate moving company, or closing the doors. It's equipment most contractors in Florida simply don't have, and it's the reason library directors call us first.

The Slow Part of A Library Renovation? We Skip It.
Days of Packing, Gone in Hours
Moving library shelves the traditional way means pulling thousands of books off, storing them somewhere, breaking down the shelving, and reassembling it all later, a process that can take days or even weeks. Our stack mover moves standard library shelving units up to 30 feet long, books still in place, and can rearrange multiple rows of stacks in just a few hours. We've handled libraries as large as 25,000 square feet without a single closure.
How We Move Your Library
Simple Process, Minimal Disruption, Every Time
1
We start with an on-site visit, and document every row of shelving, the order sections will be done in, and where each unit will go during the project. You get a clear, section-by-section plan so you know exactly what's happening and when, before a single shelf is touched.
2
Our stack mover lifts entire shelving units, books and all, and relocates them to clear the floor for installation. Nothing gets unpacked, and your collection stays in order the whole time.
3
Once the new flooring is down in that section, the shelving moves right back into place exactly as it was. Patrons walk in to new floors and a library that looks untouched, aside from the upgrade.
1
We start with an on-site visit, and document every row of shelving, the order sections will be done in, and where each unit will go during the project. You get a clear, section-by-section plan so you know exactly what's happening and when, before a single shelf is touched.
2
Our stack mover lifts entire shelving units, books and all, and relocates them to clear the floor for installation. Nothing gets unpacked, and your collection stays in order the whole time.
3
Once the new flooring is down in that section, the shelving moves right back into place exactly as it was. Patrons walk in to new floors and a library that looks untouched, aside from the upgrade.
1
We start with an on-site visit, and document every row of shelving, the order sections will be done in, and where each unit will go during the project. You get a clear, section-by-section plan so you know exactly what's happening and when, before a single shelf is touched.
2
Our stack mover lifts entire shelving units, books and all, and relocates them to clear the floor for installation. Nothing gets unpacked, and your collection stays in order the whole time.
3
Once the new flooring is down in that section, the shelving moves right back into place exactly as it was. Patrons walk in to new floors and a library that looks untouched, aside from the upgrade.
Frequently Asked Questions
Everything You Need To Know Before Your Project Gets Started
Can libraries replace flooring without moving all the books off the shelves?
Yes. Our stack mover lifts and relocates entire shelving units with the books still in place, so the old flooring comes out and the new flooring goes in without anyone having to empty a shelf.
Does a library have to close for a flooring renovation?
In most cases, no. Our process is built specifically so libraries don't have to close their doors for a flooring project.
How long does it take to replace flooring in a library?What's included in your commercial flooring installation service?
It depends on the size of the space, but moving multiple rows of stacks typically takes hours instead of the days or weeks a traditional shelf move would take, which keeps the overall project moving faster too.
What size library flooring projects can your team handle?
We've completed flooring replacements in libraries as large as 25,000 square feet, so whether you're working with a single branch or a larger central library, our process and equipment scale to the job.
Is it safe to move shelves with the books still on them?
Yes. Our stack mover is built specifically to lift and relocate loaded shelving without shifting or damaging what's on it, so your collection arrives exactly as it left.
Need Other Commercial Flooring Services?
Here's everything else we can help with.
Flooring Design & Consultation
Not sure which material fits your library best? We'll walk through your options and help you choose before anything gets ordered.
Commercial Flooring Installation
Once your plan and shelving sequence are set, our team handles installation from start to finish, with a coordinator on-site the whole time.
Commercial Flooring Repair and Replacement
Dealing with worn carpet in just a few areas? We'll assess the damage and recommend a repair or replacement that fits your budget.
Let's Plan Your Library's Renovation
Whether your project is already on the calendar or still a couple of budget cycles away, we're happy to walk your library and put together a free estimate. Get started with a phone call now.
